Click or drag to resize

MixedIntegerLinearProgrammingProblemPointIsFeasible(DoubleVector, Double) Method

Function for determining the feasibility of a give point. A point x is feasible if it satisfies all variable bounds, linear and integral constraints.

Namespace: CenterSpace.NMath.Core
Assembly: NMath (in NMath.dll) Version: 7.4
Syntax
public override bool PointIsFeasible(
	DoubleVector x,
	double tolerance
)

Parameters

x  DoubleVector
A vector to test for feasibility.
tolerance  Double
The tolerance for determining whether or not this constraint is satisfied at a particular point.

Return Value

Boolean
true if the point is feasible.
See Also